| 01 |
PWD, NH
|
Upgradation of Dindori-Sagartola-Kabirchabutra (MP-CG border) Section of NH 45 from Km 0+000 (Design) to Km 77.000 (Design) (Total length 77km) to Two lane with paved shoulder configuration along with One time improvement in 04 nos of bypassed builtup areas in a total length of 9.1 km in the state of Madhya Pradesh on EPC mode
|
Dindori
|
219.70
|
| 02 |
MPRDC ADB, Bhopal
|
Rehabilitation and Upgradation of Package 45 Anjania – Ramnagar – Regaon – Chubawal – Chakdehi – Khinha Road
|
Mandla
|
143.15
|
| 03 |
MPRRDA, Bridge
|
“Construction of Bridges under Pradhan Mantri Gram Sadak including maintenance for
Five Year after construction
Package No. MP44BR306”
|
Barhi
|
4.91
|
| 04 |
MPRDC ADB, Bhopal
|
Development of Roads on Hybrid Annuity Model in the State of Madhya Pradesh, India Under ECRMPRNP for Civil Work Package No. 37 Mehndwani-Chakdehi Road, Samnapur-Gadasarai Road & Sahajpur-Tendukheda Road.
|
Dindori
|
129.51
|
| 05 |
AAI, Bhopal
|
Construction of Parallel Taxi Track, Link Taxi and Rapid Exit Taxi at Raja Bhoj Airport, Bhopal
|
Bhopal
|
58.43
|
| 06 |
BHEL
|
PACKAGE-B: Hiring of RMC Agency for Installation of Batching Plant & Production of Required Grade of Concrete for Foundations, Sub-structures, Super-structures etc. at 2X800MW SINGRUALI STPP STAGE-III
|
Singruali
|
37.64
|
| 07 |
PWD, Bridge
|
Construction Of Submersible Bridge Across Gour River On Indra-Pipariya Khari–Bilhari-Ghunghri- Kharharghat Road In Disrict Jabalpur”
|
Jabalpur
|
10.46
|
| 08 |
PWD, Bridge
|
“Construction of Railway Over Bridge of Level Crossing No. GJ-152 in Railway K.M. 1225/8-9 Between Jabalpur-Nainpur Road in District Jabalpur In the State of Madhya Pradesh on EPC Mode”
|
Jabalpur
|
48.40
|
| 09 |
MPRDC, Bhopal
|
Construction of New Two-Lane Flyover at Pentanika Chowk on Jabalpur Mandla Road in Jabalpur District in the State of Madhya Pradesh on EPC Mode.
|
Jabalpur
|
31.35
|
| 10 |
UP
|
Construction of thin white topping road from Ranidurgawati to Allahabad chouraha and JM Heights to Army Cantt Road Length 3.08 Km.
|
Allahabad
|
11.43
|
| 11 |
MPRDC, Bhopal
|
Upgradation of Shahdol- Sagartola Section of NH 543 from km 0+000 to km 69+400 to 2 lane with paved shoulders under Hybrid Annuity Mode (HAM) in the State of Madhya Pradesh
|
Shahdol
|
405.45
|
| 12 |
MPRDC, Bhopal
|
Upgradation of Package 10 Gadasarai Pandariya Road (CG Border) in the state of Madhya Pradesh on Engineering, Procurement and Construction (EPC) Mode under proposed NDB Loan
|
Pandariya Road
|
139.49
|
| 13 |
MPRDC, Bhopal
|
Upgradation of Package 11: Bachhon – Chandla – Sarwai – Gorihar-Chandrapura Road (MP-UP Border) in the state of Madhya Pradesh on Engineering, Procurement & Construction (EPC) Mode under proposed NDB Loan
|
MP-UP Border
|
191.61
|